This site is the archived OWASP Foundation Wiki and is no longer accepting Account Requests.
To view the new OWASP Foundation website, please visit https://owasp.org
Difference between revisions of "GPC Agenda 2009-05-01"
From OWASP
m |
(→Agenda) |
||
Line 1: | Line 1: | ||
=Agenda= | =Agenda= | ||
* Determine exit criteria for SoC | * Determine exit criteria for SoC | ||
− | * Determine "core criteria" for projects | + | * Determine "core criteria" for projects (assessment frame) |
* Determine nomenclature for L0/L1/L2 for projects and L1/L2/L3 for releases | * Determine nomenclature for L0/L1/L2 for projects and L1/L2/L3 for releases | ||
* Discuss entrance criteria to L2 for projects (if time permits) | * Discuss entrance criteria to L2 for projects (if time permits) | ||
+ | ** Present "Project Health" proposal: | ||
+ | *** Define project "health" characteristics (e.g., frequency of releases, adoption rate, etc) | ||
+ | *** Entrance criteria into L2 is 50% of the "health" characteristics | ||
+ | *** Entrance criteria into L3 is 100% of the "health" characteristics (or board/GPC discretion?) | ||
+ | *** In general, projects will not backslide from L2 to L1 or L1 to L0; projects ''will'' move in and out of L3 | ||
+ | * Discuss entrance criteria for "archived" projects (if time permits) | ||
+ | |||
+ | =Action Items= | ||
+ | * Jason will summarize survey results and present at Monday's meeting | ||
=Minutes= | =Minutes= |
Revision as of 17:17, 1 May 2009
Agenda
- Determine exit criteria for SoC
- Determine "core criteria" for projects (assessment frame)
- Determine nomenclature for L0/L1/L2 for projects and L1/L2/L3 for releases
- Discuss entrance criteria to L2 for projects (if time permits)
- Present "Project Health" proposal:
- Define project "health" characteristics (e.g., frequency of releases, adoption rate, etc)
- Entrance criteria into L2 is 50% of the "health" characteristics
- Entrance criteria into L3 is 100% of the "health" characteristics (or board/GPC discretion?)
- In general, projects will not backslide from L2 to L1 or L1 to L0; projects will move in and out of L3
- Present "Project Health" proposal:
- Discuss entrance criteria for "archived" projects (if time permits)
Action Items
- Jason will summarize survey results and present at Monday's meeting