This site is the archived OWASP Foundation Wiki and is no longer accepting Account Requests.
To view the new OWASP Foundation website, please visit https://owasp.org

Difference between revisions of "Project Information:template JSP Testing Tool Project - Final Review - Second Reviewer - F"

From OWASP
Jump to: navigation, search
(Final review)
 
Line 44: Line 44:
 
  | style="width:25%; background:#7B8ABD" align="center"|  
 
  | style="width:25%; background:#7B8ABD" align="center"|  
 
2. Having into consideration the [[:Category:OWASP Project Assessment|OWASP Project Assessment Methodology]] which criteria, if any, haven’t been fulfilled in terms of '''Beta Quality''' status?
 
2. Having into consideration the [[:Category:OWASP Project Assessment|OWASP Project Assessment Methodology]] which criteria, if any, haven’t been fulfilled in terms of '''Beta Quality''' status?
  | colspan="2" style="width:75%; background:#cccccc" align="left"|Considering the reviewer received a ZIP package with all required files needed to run the application, the "stand alone executable version" requirement may be considered fullfilled, remaining only two: "About Box" and "Documentation (on how to build it from code) must stored be in the same repository as the code".
+
  | colspan="2" style="width:75%; background:#cccccc" align="left"|Considering the reviewer received a ZIP package with all required files needed to run the application, all requirements, including the "stand alone executable version", may be considered fullfilled.
 
  |-  
 
  |-  
 
  | style="width:25%; background:#7B8ABD" align="center"|  
 
  | style="width:25%; background:#7B8ABD" align="center"|  

Latest revision as of 23:14, 4 March 2009

Clik here to return to the previous page.

FINAL REVIEW
PART I

Project Deliveries & Objectives

OWASP JSP Testing Tool Project's Deliveries & Objectives

QUESTIONS ANSWERS

1. At what extent have the project deliveries & objectives been accomplished? Having in consideration the assumed ones, please exemplify writing down those of them that haven't been realised.

Design documentation, code, and user documentation have been completed. Performance needs tunning, but the display of incremental progress improved significantly the perception of performance.

2. At what extent have the project deliveries & objectives been accomplished? Having in consideration the assumed ones, please quantify in terms of percentage.

90%

3. Please do use the right hand side column to provide advice and make work suggestions.

The tests were run in FireFox 3.0.5, Google Chrome 1.0.154.48 and Internet Explorer 7.0.6. They were completed successfully only in FireFox 3.0.5.
PART II

Assessment Criteria

OWASP Project Assessment Criteria

QUESTIONS ANSWERS

1. Having into consideration the OWASP Project Assessment Methodology which criteria, if any, haven’t been fulfilled in terms of Alpha Quality status?

None

2. Having into consideration the OWASP Project Assessment Methodology which criteria, if any, haven’t been fulfilled in terms of Beta Quality status?

Considering the reviewer received a ZIP package with all required files needed to run the application, all requirements, including the "stand alone executable version", may be considered fullfilled.

3. Having into consideration the OWASP Project Assessment Methodology which criteria, if any, haven’t been fulfilled in terms of Release Quality status?

N/A

4. Please do use the right hand side column to provide advice and make work suggestions.

Great job!