This site is the archived OWASP Foundation Wiki and is no longer accepting Account Requests.
To view the new OWASP Foundation website, please visit https://owasp.org

Difference between revisions of "Summit 2011/Schedule - Concepts and Structure"

From OWASP
Jump to: navigation, search
Line 1: Line 1:
 
''' NOTE: THIS PAGE CURRENTLY CONTAINS A BRAIN DUMP''' (Jim please edit and delete this NOTE when you are happy with its content)
 
''' NOTE: THIS PAGE CURRENTLY CONTAINS A BRAIN DUMP''' (Jim please edit and delete this NOTE when you are happy with its content)
 +
 +
=Discussion group=
 +
There is a dedicated Discussion Forum for Summit Schedule items, which can be found here: https://groups.google.com/a/owasp.org/group/summit-2011-schedule
 +
 +
=Concepts=
 +
 +
The key objecives of the Summit Schedule are:
 +
* Maximize Attendees productivity (while at the Summit)
 +
* Attack as much talent (and key players) to the Summit as possible
 +
 +
===Schedules===
 +
 +
There will be a number of different schedules that need to be created

Revision as of 11:19, 11 January 2011

NOTE: THIS PAGE CURRENTLY CONTAINS A BRAIN DUMP (Jim please edit and delete this NOTE when you are happy with its content)

Discussion group

There is a dedicated Discussion Forum for Summit Schedule items, which can be found here: https://groups.google.com/a/owasp.org/group/summit-2011-schedule

Concepts

The key objecives of the Summit Schedule are:

  • Maximize Attendees productivity (while at the Summit)
  • Attack as much talent (and key players) to the Summit as possible

Schedules

There will be a number of different schedules that need to be created