This site is the archived OWASP Foundation Wiki and is no longer accepting Account Requests.
To view the new OWASP Foundation website, please visit https://owasp.org

Difference between revisions of "March 7, 2011"

From OWASP
Jump to: navigation, search
(Vote required:)
(Added GPC items; Made Mark's last GConfC sentence italics instead of bold as the bold text was making it hard to delineate from the next voting item)
Line 1: Line 1:
== '''Vote required:''' ==
+
= Votes required =
  
'''Remove the "board member representative" requirement for the Global Committees. '''  
+
* '''Remove the "board member representative" requirement for the Global Committees. '''  
  
 
This idea was intiated as a mechanism to provide the committeess with a "line" to the board.  It has evolved, however, into a percieved "veto" option for the board.  Instead, I recommend we implement a "requirement" for the Global Committee chair to present their committee progress to the Board during the meetings.  This moves the requirement of participation from the Board and provides the Committee an opportunity to present items that require vote.  Board members should be allowed to participate as a committee member, but should not be considered a committee chair or looked to as a committee member who has privelages above other committee members.
 
This idea was intiated as a mechanism to provide the committeess with a "line" to the board.  It has evolved, however, into a percieved "veto" option for the board.  Instead, I recommend we implement a "requirement" for the Global Committee chair to present their committee progress to the Board during the meetings.  This moves the requirement of participation from the Board and provides the Committee an opportunity to present items that require vote.  Board members should be allowed to participate as a committee member, but should not be considered a committee chair or looked to as a committee member who has privelages above other committee members.
  
'''Approve $5K in funding for the Global Membership, Global Conferences, and Global Chapter Committees for operational support'''
+
* '''Approve $5K in funding for the Global Membership, Global Conferences, and Global Chapter Committees for operational support'''
  
 
These three committees have initiatives for 2011 as defined during the summit.  These initiatives will require many "tasks" that are time consuming and will require uninterrupted hours to complete.  I would like the committee chair to "approve" the selection.  These contracted staff will be supervised by me, the Operations Director.  Tasks managed and outcomes tracked as directed by the committee chairs.
 
These three committees have initiatives for 2011 as defined during the summit.  These initiatives will require many "tasks" that are time consuming and will require uninterrupted hours to complete.  I would like the committee chair to "approve" the selection.  These contracted staff will be supervised by me, the Operations Director.  Tasks managed and outcomes tracked as directed by the committee chairs.
Line 11: Line 11:
 
[http://www.owasp.org/images/6/6b/Operational_Support_for_OWASP_Global_Committee.pdf Job Description]
 
[http://www.owasp.org/images/6/6b/Operational_Support_for_OWASP_Global_Committee.pdf Job Description]
  
'''Status of Tesauro Consulting Inititive'''
+
* '''Status of Tesauro Consulting Inititive'''
  
 
Is the OWASP Board going to continue working on the Core Values, Core Purpose, and so on, or is this going to be assigned to the Global Committee Chairs to finish?
 
Is the OWASP Board going to continue working on the Core Values, Core Purpose, and so on, or is this going to be assigned to the Global Committee Chairs to finish?
  
'''OWASP/First Relationship'''
+
* '''OWASP/First Relationship'''
  
 
[https://lists.owasp.org/pipermail/owasp-board/attachments/20110217/86057c8d/attachment-0001.pdf Partnership agreement] between OWASP and FIRST.  Already has the concurrence of the GCC
 
[https://lists.owasp.org/pipermail/owasp-board/attachments/20110217/86057c8d/attachment-0001.pdf Partnership agreement] between OWASP and FIRST.  Already has the concurrence of the GCC
  
''' Conference Profit Sharing Model'''
+
* ''' Conference Profit Sharing Model'''
  
 
GCC approval on Jan 11th 2011 meeting [https://docs.google.com/a/owasp.org/document/d/1eVX6lDyAtsUBrDKp6C7pcPTk8ObCv-QgnFAGq_zj510/edit?hl=en Meeting Minutes]
 
GCC approval on Jan 11th 2011 meeting [https://docs.google.com/a/owasp.org/document/d/1eVX6lDyAtsUBrDKp6C7pcPTk8ObCv-QgnFAGq_zj510/edit?hl=en Meeting Minutes]
Line 29: Line 29:
 
[https://lists.owasp.org/pipermail/owasp-board/2011-February/004353.html Additional Details]
 
[https://lists.owasp.org/pipermail/owasp-board/2011-February/004353.html Additional Details]
  
'''GCC Representative Funding'''
+
* '''GCC Representative Funding'''
  
 
The board had asked the GCC to discuss the funding mechanism for GCC
 
The board had asked the GCC to discuss the funding mechanism for GCC
Line 52: Line 52:
 
and assessments would not be achieved.   
 
and assessments would not be achieved.   
  
'''In short, the GCC recommends to the board that this funding stream be placed under the GCC budget as originally requested in the amount of $10,000'''.
+
''In short, the GCC recommends to the board that this funding stream be placed under the GCC budget as originally requested in the amount of $10,000.''
  
 +
* '''Projects Committee 2011 Budget Proposal'''
 +
The projects committee has drafted a [https://docs.google.com/a/owasp.org/document/d/11HjbUeJxyRbQ4Jg6Wg7LceMZox0wz3Fz-LUwjfam5eg/edit?hl=en detailed budget] proposal to support four (4) GPC initiatives. For each initiative, the budget outlines projected estimates based on market research and describes ''exactly'' '''how''' and '''when''' the funds would be utilized. The budget also provides a detailed (12 pages long!), well thought out plan with ''concrete goals'' and ''tangible deliverables'' in order to evaluate initiative success. The four initiatives include: Project Hosting, GPC Working Sessions, Project Support, and Project Incentives.
 +
 +
The Global Projects Committee 2011 Budget Proposal can be found [https://docs.google.com/a/owasp.org/document/d/11HjbUeJxyRbQ4Jg6Wg7LceMZox0wz3Fz-LUwjfam5eg/edit?hl=en here].
 +
 +
= Committee Updates =
 
== '''Conferences''' ==  
 
== '''Conferences''' ==  
 
'''GCC Representative Roles and Responsibilities at Events'''
 
'''GCC Representative Roles and Responsibilities at Events'''
Line 82: Line 88:
 
**Any unique outstanding elements
 
**Any unique outstanding elements
 
**Any issues
 
**Any issues
 +
 +
== Projects ==
 +
 +
GPC Updates:
 +
 +
* The GPC has welcomed three (3) new members (Chris Schmidt, Justin Searle, and Larry Casey) and is looking forward to welcoming Keith Turpin upon completion of his application (Keith has already participated in GPC Meetings).
 +
* [https://docs.google.com/document/d/10qW-Jh7IFoTsp9eh-t_aHiderkCDLFk0KCx2TNOuxoI/edit?hl=en Project Hosting RFP] in final review
 +
* Fleshing out the proposed [https://docs.google.com/a/owasp.org/leaf?id=0B2vv_7Gz8Z7TOWYyN2VjNjgtMWU1My00YjkxLTk0ZGYtNmUyMTNmMDg4YzI0&sort=name&layout=list&num=50 OWASP Project Lifecycle]
 +
** Recent addition of "OWASP Enterprise"
 +
** Hinges on Project Hosting to manage lifecycle and Project Incentives to drive adoption by leaders
 +
 +
== Membership ==
 +
 +
== Education ==
 +
 +
== Industry ==
 +
 +
== Chapters ==
 +
 +
== Connections ==

Revision as of 04:58, 8 March 2011

Votes required

  • Remove the "board member representative" requirement for the Global Committees.

This idea was intiated as a mechanism to provide the committeess with a "line" to the board. It has evolved, however, into a percieved "veto" option for the board. Instead, I recommend we implement a "requirement" for the Global Committee chair to present their committee progress to the Board during the meetings. This moves the requirement of participation from the Board and provides the Committee an opportunity to present items that require vote. Board members should be allowed to participate as a committee member, but should not be considered a committee chair or looked to as a committee member who has privelages above other committee members.

  • Approve $5K in funding for the Global Membership, Global Conferences, and Global Chapter Committees for operational support

These three committees have initiatives for 2011 as defined during the summit. These initiatives will require many "tasks" that are time consuming and will require uninterrupted hours to complete. I would like the committee chair to "approve" the selection. These contracted staff will be supervised by me, the Operations Director. Tasks managed and outcomes tracked as directed by the committee chairs.

Job Description

  • Status of Tesauro Consulting Inititive

Is the OWASP Board going to continue working on the Core Values, Core Purpose, and so on, or is this going to be assigned to the Global Committee Chairs to finish?

  • OWASP/First Relationship

Partnership agreement between OWASP and FIRST. Already has the concurrence of the GCC

  • Conference Profit Sharing Model

GCC approval on Jan 11th 2011 meeting Meeting Minutes

Local host chapters will share in OWASP event profits under the following schedule. In the case of multiple host chapters, the host chapters will be responsible for determining the division before the event.

  • Global AppSec Conference - 25% of event profits with a $5,000 USD cap ($10,000 for multi-chapter events)
  • Regional/Theme Events - 30% of event profits with a $4,000 USD cap
  • Local Events - 50% of profits with a $3000 USD cap

Additional Details

  • GCC Representative Funding

The board had asked the GCC to discuss the funding mechanism for GCC representation at events (GCC budget or against individual conferences). This was discussed and voted upon at the Feb GCC meeting and the committee decided that it would be best to manage these funds out of a GCC travel budget for supporting events. The GCC felt that, as at the end of the day it's all the foundation's money, the benefits of rolling this travel under the conference budget (therefore showing more "expenses" to their budget, allegedly encouraging them to earn more money to break "even") did not outweigh the "perceived" costs of offering conferences direct on-site support and then "charging" them for it. As the travel costs are likely to have a small impact on a Global AppSec Budget (approx $2000/trip) it's not likely going to impact the bottom line of the conference and would not likely be the sole motivating factor for planners to get additional sponsorship income. The potential soft costs to the ability of the GCC to conduct it's oversight role may be significantly impacted by making the planners pay a "tax" that is wholly internal to the organizations accounting and has no real allocation. Additionally, in the cases where a conference planner said "thanks but no thanks" to a GCC rep at their conference, the larger goals of better contract management, event feedback and assessments would not be achieved.

In short, the GCC recommends to the board that this funding stream be placed under the GCC budget as originally requested in the amount of $10,000.

  • Projects Committee 2011 Budget Proposal

The projects committee has drafted a detailed budget proposal to support four (4) GPC initiatives. For each initiative, the budget outlines projected estimates based on market research and describes exactly how and when the funds would be utilized. The budget also provides a detailed (12 pages long!), well thought out plan with concrete goals and tangible deliverables in order to evaluate initiative success. The four initiatives include: Project Hosting, GPC Working Sessions, Project Support, and Project Incentives.

The Global Projects Committee 2011 Budget Proposal can be found here.

Committee Updates

Conferences

GCC Representative Roles and Responsibilities at Events

The GCC will now send a representative to all Global AppSec Events and to other regional events as budget allows. This member of the GCC will be identified early and assigned to liaise with the conference planners and provide a single point of contact for interfacing with the committee. They will also work with Dave to go through "training" for signature authority on contracts less than or equal to $15,000 USD in the scope of the assigned conference. While on-site the GCC representative will provide logistical, contracting and other on-site support as well as report back to the committee in the following areas (from the GCC 2011 Comprehensive plan):

GCC member shall:

  • interface with the local planning committee at least 1 month before trip (attend planning call)
  • Interact with planners/attendees while at conference
  • Interact with Sponsors
  • Sign conference contracts under $15,000 (once approved)
  • At the next GCC meeting the traveling member will be expected to
  • Provide an post trip report covering
    • Assessment of facility
    • Event Marketing Strategy
    • Examination of Event Budget
    • Estimation of Speaker Quality
    • Sponsor engagement/cost-effectiveness & feedback
    • Any notable comments from planners/attendees
    • Any unique outstanding elements
    • Any issues

Projects

GPC Updates:

  • The GPC has welcomed three (3) new members (Chris Schmidt, Justin Searle, and Larry Casey) and is looking forward to welcoming Keith Turpin upon completion of his application (Keith has already participated in GPC Meetings).
  • Project Hosting RFP in final review
  • Fleshing out the proposed OWASP Project Lifecycle
    • Recent addition of "OWASP Enterprise"
    • Hinges on Project Hosting to manage lifecycle and Project Incentives to drive adoption by leaders

Membership

Education

Industry

Chapters

Connections